
Scamec LC Thor
Overview
The Scamec LC Thor marks the start of a new era of underground scaling operations
It is designed in close collaboration with our customers, combining Normet’s decades-long experience in developing cutting-edge underground equipment with scaling operators’ invaluable experience in everyday scaling work. As a result of that collaboration, this purpose-built machine brings boom accuracy and handling, work area visibility and operator ergonomics – and, consequently, safety and productivity of the whole scaling process – to a higher level than ever before.
The Scamec LC Thor has an extremely safe FOPS/ROPS approved cabin with excellent visibility and unforeseen operator ergonomics. It is equipped with a completely new, agile and accurate boom for precise and efficient scaling. It has an effective vertical reach of up to 9.5 meters and fits tunnels measuring 4 meters wide and 2.7 meters high.
Scamec LC Thor is designed with four decades of experience in underground scaling
Key specification
- Normet’s flagship scaler
- Vertical boom reach: 9.5 m
- Tramming height: 2.7 m
Features
Safety
- FOPS/ROPS approved cabin with lifting and tilting
- Improved visibility due wide-angle mirrors and slim boom base structure and flat bar design of the windshield’s protective mesh
- Cabin door interlock switches with safety brake application
- Automatic fire suppression system
- Optional reverse camera system for superior reversing visibility
- Optional line-of-sight remote operation system
- Optional emergency escape system
Ergonomics and operator environment
- Ergonomically designed operating controls for efficient scaling work
- Agile boom and extremely accurate boom movement control
- Foot pedal for hammer operation
- Electric operation with zero local emissions
- Advanced dust suppression system
- Optional heater and air conditioning
- Optional boot and cabin floor washers
Productivity and efficiency
- The latest Volvo Penta Stage V engine technology with 9 % (15 kW) more power than Scamec 2000, also available with Volvo Penta Stage III
- 75 % bigger fuel tank, 175 % bigger water tank and 65 % bigger hydraulic oil tanks than Scamec 2000
- Available with an optional dozer blade for clearing the way in the tunnel face
- Purpose-built machine with a modular design and superior durability and serviceability