The contractor had been experiencing issues with inadequate early age strength development of their sprayed concrete during construction of tunnel cross passages under the River Thames. The main issue was the application of sprayed concrete onto extremely wet chalk excavated surfaces with active water ingress through many fissures.
The Job/ The Challenge
The challenge was to meet the early strength requirement of “J2 modified” set by the Crossrail project which the contractor was not achieving with its original supplier and approach. Normet were called in by Hochtief-Murphy JV to attend site urgently to assist them with these early age strength issues and provide a solution to allow safe and effective rock support in the given wet conditions. Normet had to mobilise quickly in order to help the contractor get back on schedule. Trials were organised within the same week contact was made.
The Solution
Normet were able to supply the contractor with two types of alkali-free set accelerator to test. Normet provided their standard TamShot 80AF product which was supplied to the majority of SCL contracts at Crossrail, but also a more powerful accelerator TamShot 100AF.
In discussions with the Hochtief-Murphy JV team, the additional outcome to ensure improved performance was to switch to the Cemex dry silo mortar solution (DSM), as the Normet admixtures and cement type in the silo are also optimised for early age strength development, good open times and ease of pumping.
Normet further supported the contractor by auditing their procedures on site to make sure all steps of the process from batching through to spraying were being done efficiently. Normet provided recommendations such as improved logistic options, and using hot water and air from the compressor to further optimise early strength development.
Project Outcome
Following successful trials with both set accelerators and the Cemex DSM solution, Hochtief-Murphy JV achieved very high early age strength development as shown in the chart above. This allowed them to construct their cross passages safely and effectively in the extremely wet ground conditions.
A Normet Minimec small tunnel diameter spraying robot was also employed for sprayed concrete applications.
Related to this story
Connect with us
Contact us
Please contact us if you would like to request a quote or find out more about how Normet can deliver tangible technical and economic benefits for your business.
Request more information on this product/service
Please contact us if you would like to request a quote or find out more about this product/service.
Access content
Please fill in your information and you will be redirected to the content you have requested.
Every once in a while, you will receive useful updates and news related to Normet’s advanced solutions. You can unsubscribe at any time. We value and respect your privacy. Please read our Legal Notice and Privacy.
Our new website for selected language is under construction. Please visit the English website for latest updated information.