Crossrail C435 – Farringdon Station, United Kingdom
Crossrail C435 – Farringdon Station, United Kingdom
CONTRACTOR: BAM FERROVIAL KEIR JV
The Crossrail Sprayed Concrete Lining (SCL) design at C435 Farringdon Station is comprised of a permanent sprayed concrete primary and for the most part a cast insitu secondary lining for both the main platform and concourse tunnels.
The SCL design was to be used for all platform tunnels, concourses and cross passages, and also included ventilation tunnels and shafts.
The Job/ The Challenge
Of particular importance at Farringdon Station was the need for very high early strength concrete to ensure full ground support in the mixed Lambeth Group formations, which can often be sandy and sometime can flow uncontrollably if there is a lot of ground water present. Furthermore, key London Underground and Overground railways exist above the Farringdon Station Crossrail tunnels. Therefore toolbox measures such as dewatering and probing were vital, coupled with a high performance, reliable sprayed concrete solution to ensure fast ground stabilisation and reduced settlement.
The sprayed concrete challenge involved developing a pumpable, flow retaining wetmix sprayed concrete that could be delivered from either an on-site or off-site batching plant to meet the early strength requirement of “J2 modified” from 10 minute age, and the physical properties of a permanent, durable, fibre reinforced sprayed concrete lining.
The solution
Normet worked full time with the BFK JV team in developing and fine tuning concrete mixes further from the successful trial period, and eventually defined two mixes based on open time - a 4 to 6 hr mix for site batched concrete, and a 8 to 10 hr mix required to facilitate off site batching and delivery through the busy London area. Both mixes used Normet’s TamCem 60 high performance plasticizer and TamCem HCA hydration control admixture, the latter being used to extend the open time of the mixes. To provide the enhanced early age strength performance, Compared to the requirements at C410, BFK JV selected higher dosages of TamShot 80AF set accelerator, typically between 7 and 8% by weight of cement to achieve the J2 (as illustrated below) modified requirements after spraying to 30 minutes age. The even higher performing TamShot 100AF was used for sections where higher risk of ground problems was envisaged.
Project Outcome
The BFK JV projects C435 Farringdon Station and C410 Bond Street and Tottenham Court Road Stations was a significant major sprayed concrete tunnelling project beneath key high-value structures in London. The logistic control of the mix and supply arrangements enable the contractor to reduce downtimes and wastage to a minimum, whilst achieving very high-performance permanent sprayed concrete for both primary and secondary lining shells. Normet were successful with BFK JV is supplying over 60% of the sprayed concrete solutions on the largest Metro project in Europe.
Related to this story
Connect with us
Contact us
Please contact us if you would like to request a quote or find out more about how Normet can deliver tangible technical and economic benefits for your business.
Request more information on this product/service
Please contact us if you would like to request a quote or find out more about this product/service.
Access content
Please fill in your information and you will be redirected to the content you have requested.
Every once in a while, you will receive useful updates and news related to Normet’s advanced solutions. You can unsubscribe at any time. We value and respect your privacy. Please read our Legal Notice and Privacy.
Our new website for selected language is under construction. Please visit the English website for latest updated information.