Main Contractor: Skanska / Porr / A.Hak joint venture
Project Information
The existing section of pipeline across the River Humber needed to be replaced because the riverbed profile had changed over time, exposing the pipeline. Some work was carried out a few years ago to keep the pipeline buried on the riverbed, but a long-term solution was needed. The River Humber Gas Pipeline Replacement Project is a £100m design and build contract issued by National Grid to replace the Feeder 9 high pressure gas pipeline under the River Humber. A 5.4 km long, 1050 mm diameter gas pipe bypassed the existing pipeline which was installed in 1984. A slurry TBM mined a 3.65-meter diameter tunnel around 35 meters under the riverbed. The tunnel lining was constructed from 225 mm of thick interlocking segments. Once the tunnel was finished, a new 42-inch diameter gas pipeline was designed to be laid inside it.
Product Requirements
The solution entailed creating a cost-effective backfill grout mix designed to satisfy the following client specification:
Normet Impact
During tender, Normet produced a cost-effective mix at our labs, which adhered to the clients mix design requirements. Prior to the first ring build Normet engineers were present on site to optimise and audit the grout batching plant operation. This ensured that the grout quality and batching operation was an easy and efficient process for the client.
Normet provided on-site training to engineers enabling them to test the quality of the grout they produced. Defining a set procedure and specification for testing allowed the client to take control and actively measure the quality of the grout they were producing.
The introduction of Normet’s chemicals and technical team ensured zero grout wastage throughout the project. Porr/Skanska/A.Hak was extremely happy with the backfill grout design; Normet project engineering provided the backfill grout specification based on the project parameters and personal experience. Furthermore, Normet analysed the grout on site and offered regular audits to ensure the agreed specification was fulfilled.
Please contact us if you would like to request a quote or find out more about how Normet can deliver tangible technical and economic benefits for your business.
Request more information on this product/service
Please contact us if you would like to request a quote or find out more about this product/service.
Access content
Please fill in your information and you will be redirected to the content you have requested.
Every once in a while, you will receive useful updates and news related to Normet’s advanced solutions. You can unsubscribe at any time. We value and respect your privacy. Please read our Legal Notice and Privacy.
Our new website for selected language is under construction. Please visit the English website for latest updated information.