Anfo Charging

Anfo Charging

Anfo explosives charging equipment

Anfo Charging equipment

Charmec LC 605 DA(V) Long End
Charmec LC 605 DA(V) Long End Charger Equipment

Charmec LC 605 DA(V) Long End

  • Designed for face and production charging in underground mines and tunnels up to 65 m2 cross sections where max face height is 8.8 m
  • Stage IIIA
Charmec LC 605 DA(V) Long end Tier4f

Charmec LC 605 DA(V) Long end Tier4f

  • Designed for face and production charging in underground mines and tunnels up to 65 m2 cross sections where max face height is 8.8 m
  • Long End Model
  • Stage IV
Charmec MC 605 DA short end
Charmec MC 605 DA short end ANFO charger (short end model) with diesel hydraulic drive is designed for face and production charging in underground mines and tunnels

Charmec MC 605 DA short end

  • Designed for face and production charging in underground mines and tunnels up to 65 m² cross sections where max face height is 8.8 m
  • Short end model
  • Stage IIIA
Charmec MC 605 DA short end Tier4f
Charmec MC 605 DA short end ANFO charger (short end model) with diesel hydraulic drive is designed for face and production charging in underground mines and tunnels

Charmec MC 605 DA short end Tier4f

  • Designed for face and production charging in underground mines and tunnels up to 65 m² cross sections where max face height is 8.8 m.
  • Short end model
  • Stage IV
Charmec MF 605 DA
Charmec MF 605 DA charger designed for face and production charging in underground mines and tunnels

Charmec MF 605 DA

  • Designed for face and production charging in underground mines and tunnels up to 65 m² cross sections where max face height is 8.4 m
  • Stage IIIA
Charmec SF 605 DA(V)
Charmec SF 605 DA ANFO charger

Charmec SF 605 DA(V)

  • Designed for face and production charging in underground mines and tunnels up to 65 m² cross sections where max face height is 8.4 m
  • Stage IIIA
Charmec RM 905 TCA
Charmec RM 905 TCA

Charmec RM 905 TCA

  • Self propelled diesel driven twin boom unit for charging, man lifting and installing works in underground excavation and tunnelling
  • Stage IV
Subscribe to newsletter